Precision Piling
Piling Durban

Auger Piles - most commonly used pile Continuous Flight Auger - CFA Contiguous Piles
Message Phone
Profile Website
Video Image Gallery
Home Pile Africa
Home Pile Africa
Repairing cracked houses is our speciality.

Each underpin pile is driven to refusal, which ensures that the walls are stabilised in almost any soil type.

Underpin piles have a 5 year load guarantee. We can also pile in very confined spaces.
Message Phone
Profile Website
Video Image Gallery

 Piling foundations  :  Get multiple free quotes in Durban

;

What is piling ?

Deep foundations are sometimes indicated by geotechnical engineers when soil conditions are poor or a heavy design load needs to be carried.

Piling makes deep foundations possible. Piles are commonly made from reinforced concrete and steel

 

Auger Piles


Standard auger piling is the most commonly used pile and is best suited to partially saturated cohesive and residual soils. The piles are installed by means of drilling with an auger rig.

Drilling is carried out by rotation of the drilling head and lowering of the auger allowing it to penetrate into the soil. Once the auger flight is full with soil it is withdrawn and spun off. This procedure is repeated until the desired depth is reached.

Once the drilled hole has been completed, a reinforcing cage is lowered down into position. The shaft is then filled with concrete and is vibrated  to assist compaction of the liquid concrete.


 

Continuous Flight Auger (CFA)


CFA is suited to saturated ground conditions where collapse and groundwater are a problem. These piles are installed by means of a hollow continuous flight auger, and drilled into the ground .

When the desired founding level is reached in soil or rock, cement grout is pumped into the hollow stem of the auger. The spoil rising up the auger ensures that soft material cannot fall into the void at the bottom of the rock socket.This also flushes the base of the pile ensuring a clean contact with the bedrock.

The auger is then slowly withdrawn from the ground, bringing the soil held between its flights with it. While grout is simultaneously filling the shaft.

Once the auger has been removed from the grout-filled pile shaft, a steel reinforcement cage is immediately lowered into the liquid grout.

Various sizes and depths are possible according to design